# What PaveKeep does

There are 11 things PaveKeep does. This page is generated from the
product’s own capability registry, so it is a list of what is built rather than a list
of what somebody decided to say. Anything unfinished carries its limit in the same
sentence as the feature, which is the only arrangement that survives being quoted.

*Read from the product on the day this page was built. The registry behind it last changed 2026-09-12.*

## Finished

**Budget planning.** Put in a budget and a number of years, and see what it buys: which roads get done, what condition the network ends up in, and what a different budget would have bought instead.

**The works programme.** A ranked list of what to fix, in what order, at what cost — with the reason each road is on the list, and how much it would take to reach a condition target.

**Statutory and funding packs.** The documents a council has to produce: what the network is worth, what work happened and who paid for it, and the state of the network as it stood on a chosen date.

**Getting data out.** The whole network in a standard mapping format, so it opens in the council's own GIS. Nothing is locked in.

**Work actually done.** A record of completed work with its cost, who funded it, and the agreement or disaster declaration it happened under — which is what an acquittal or an audit asks for.

**Condition over time.** How the network has actually changed between surveys, rather than a single snapshot.

**Council-ready documents.** Three finished documents from the same data — a committee paper, a short brief for a councillor or general manager, and a grant submission — each written for the person who reads it.

**Looking ahead.** What the network will look like in five or ten years under different spending levels, so a council can show the cost of doing nothing.

## Not finished

3 capabilities are built but incomplete.
They are listed here with the same wording they carry everywhere else.

**Gravel and unsealed roads.** Unsealed roads are scored on their own terms rather than borrowing a sealed-road method. They are handled as one group. We cannot yet report gravel, formed and unformed lengths separately, which some state returns ask for.

**Lane-by-lane condition.** Where a council surveys lanes separately, each lane keeps its own condition and its own recommended treatment. We can show a lane needs different work; we cannot yet price it, because nothing records how wide a single lane is.

**Learning what treatments achieve.** Comparing condition before and after work to estimate what a treatment actually delivered. Modelled from a small number of observations rather than measured, off unless a council turns it on, and not a basis for a spending decision yet.

## What it can be shown doing

Eight things can be demonstrated on a working network rather than described.

- **P1.** Every number can be traced back: which survey, which setting, which piece of arithmetic. The software explains itself rather than asking to be trusted.
- **P2.** A sealed road, a sprayed-seal road and a gravel road are scored by different methods, because they fail in different ways.
- **P3.** A road nobody has surveyed is reported as unknown, never as zero and never quietly averaged away. This is the one councils test us on.
- **P4.** Heavy vehicle traffic changes how fast a road is expected to wear out, and the change is visible rather than buried in a model.
- **P5.** The network as it stood on any past date — what an auditor or a funding body asks for when they reopen a claim.
- **P6.** A chain from the survey, to the work done, to who paid for it, to the declaration it happened under.
- **P7.** It sits beside the systems a council already has rather than demanding they be replaced.
- **P8.** From a spreadsheet of roads to a defensible works programme, measured, without a consultant in between.

See also: [what PaveKeep cannot do yet](/what-it-cannot-do-yet).

---

Source: https://pavekeep.com.au/what-it-does · PaveKeep · derived content
