# Routine, preventive, rehabilitation: three kinds of road work, and what each is for

*"Fix the worst first" is not a strategy, it is the absence of one. Austroads
already names the three kinds of maintenance and says plainly what the middle one
is for — and the middle one is the one councils under pressure stop doing first.*

Every council does road maintenance. Far fewer can say, in a sentence a
councillor will follow, which *kind* of maintenance a given job was and why that
was the right kind.

Austroads does say it. *Guide to Pavement Technology Part 7* divides maintenance
into three, and the definitions are worth reading in the original because the
middle one carries the whole argument.

## The three kinds

**Routine maintenance** addresses minor defects on the carriageway, off-
carriageway work like drain clearing and grass cutting, and the essential
activities that keep a base level of road safety — removing obstacles, making a
hazard safe. Austroads notes these works are "normally unplanned or planned with
short lead time", using light equipment and small quantities of material.

Pothole patching lives here. So does most of what a council does in a wet winter.

**Preventative periodic maintenance** is the one to read twice. Austroads
defines it as work "intended to reduce future deterioration by timely surface
interventions to limit the need for expensive rehabilitation, and to ensure
minimum skid resistance and general safety levels do not fall below minimum
accepted levels". It is planned, with lead time generally greater than a month.

Three words in that definition do the work: *reduce future deterioration*,
*timely*, and *limit the need for expensive rehabilitation*. A reseal on a sound
pavement is not a small repair. It is the thing that stops a large one.

**Rehabilitation** targets roads whose ride quality has deteriorated
significantly, or which no longer have the structural capacity for the traffic
they carry. Planned with months of lead time, usually inside an annual or
three- to five-year programme.

## Why the middle one goes first

Routine maintenance is forced on you: a pothole opens and somebody rings. The
road is already failing, and the work is already overdue.

Rehabilitation is visible: it is a capital line item, it appears in a budget, and
somebody has to approve it.

Preventive work is neither. Nobody rings about a road that is still sound. It
does not look urgent in a photograph. And the year you skip it, nothing happens —
the consequence arrives three to seven years later, by which time it looks like
general deterioration rather than a decision anyone made.

So it is the line that gets deferred, and deferring it is the most expensive
thing a road budget can do slowly.

## It is happening now, and an auditor-general has written it down

This is not a theoretical risk. In September 2026 the Victorian Auditor-General
published *Maintaining State Roads*, and its findings describe the mechanism
above almost exactly.

Around **48% of Victoria's state roads were in poor or very poor condition in
2024, up from around 39% in 2021**. The gap between the number of defects
recorded and the number repaired **more than doubled between January 2025 and
June 2026** — the network deteriorating faster than the pace of repairs.

And the cause, in VAGO's words: the department "has advised the government that
funding is insufficient to maintain or improve the condition of state roads. This
has meant it focuses more on reactive and safety-critical repairs rather than
preventative works."

That is the middle category being squeezed out, observed and audited.

**One important qualification.** VAGO was auditing *state* roads, which are
around 15% of Victoria's network by length and are managed by the department,
not by councils. Councils manage the rest. The findings are not a statement about
any council's roads — they are evidence that the funding-to-reactive-work
mechanism is real at scale, in an Australian jurisdiction, now.

## The evidence, and where it comes from

The strongest numbers on this question are American and old, and they should be
labelled as both.

The US Federal Highway Administration's *Pavement Preservation: The Preventive
Maintenance Concept* (FHWA-HI-00-006, 1999) is the standard reference. Its
findings: a dollar spent on preservation defers four to five dollars of
rehabilitation; in Michigan, rehabilitation cost roughly fourteen times
preventive work per lane-mile; network simulations in New York, Michigan and
Wisconsin found that "preservation first, then worst roads" outperformed
"worst first" at the same budget.

Two cautions a careful reader will raise, and should:

- **It is US evidence** from a different funding structure and a different
  climate, now twenty-seven years old. The *logic* — right treatment, right
  pavement, right time — is current practice. The multipliers are not
  Australian and should not be presented as though they were.
- **The ratios are idealised.** They come from modelled comparisons, not from a
  controlled trial on your network.

Which is the honest reason to test it on your own roads rather than to quote it:
a before-and-after record of your own treatments, with the condition before the
work and the cost, is worth more to your council than any number from 1999.

## What this looks like in a works programme

If the three kinds are real, the programme should be able to say which kind each
job is, and the answer should not be "rehabilitation" for everything.

Four questions that make the distinction concrete:

1. **What was the condition before the work?** Preventive work by definition
   happens on a structurally sound pavement. If the pre-treatment condition is
   not recorded, you cannot later tell whether a treatment worked, or even
   whether it was the right kind.
2. **What would this road have cost if left another three years?** That is the
   comparison preventive work wins, and it is the only comparison in which it
   does.
3. **At this budget, what gets deferred?** Deferral is a decision. It is worth
   making it visibly.
4. **How much of the programme is reactive?** A programme that is nearly all
   routine maintenance is a network being managed by its own failures.

## How PaveKeep handles this

PaveKeep produces a ranked, costed works programme with the reason each road is
on the list, and shows what a given budget buys over five or ten years —
including what a different budget would have bought instead. That comparison is
how the preventive case gets made to a council: not as a principle, but as two
columns.

What it does not yet do: it does not learn what a treatment actually achieved
from before-and-after condition, which is the one thing that would turn the US
evidence above into your own. The feature exists, is modelled from a small number
of observations rather than measured, is off unless a council turns it on, and
is not a basis for a spending decision yet.

PaveKeep is built for small and regional councils and is not yet in use at any
council.

## Sources

- Austroads (2009), *Guide to Pavement Technology Part 7: Pavement Maintenance*,
  §1 — the routine / preventative periodic / rehabilitation division and the
  definitions quoted above.
- Austroads (2025), *Guide to Pavement Technology Part 5: Pavement Evaluation
  and Treatment Design* — where periodic maintenance and rehabilitation design
  are treated.
- Victorian Auditor-General's Office (9 September 2026), *Maintaining State
  Roads*, Report 2026–27 — the 48%/39% condition figures, the defect gap, the
  15% and 82% network shares, and the funding finding quoted above.
- Federal Highway Administration / National Highway Institute (1999), *Pavement
  Preservation: The Preventive Maintenance Concept — Executive Overview*,
  FHWA-HI-00-006. **US evidence.**

---

Source: https://pavekeep.com.au/knowledge/kinds-of-road-maintenance · PaveKeep · bound content